Rosslare Rangers FC, Co. Wexford
600 sq/m artificial grass training surface.
Completed
St Ignatius College, Enfield, UK
1,630 sq/m multi-sport surface.
Completed
David Lloyd Health & Fitness, Belfast
Replacing old tennis surface with 450 sq/m 3G pitch
Completed
Terenure College, Templeogue Road, D6W
Artificial grass rugby training Area – 1,190 sq/m 3G pitch including strip and removal of existing carpet and shock pad, timber edge, fencing, sports netting, and shock pad.
5-a-side-area – 1,102 sq/m 3G artificial turf playing surface, including perimeter edging, fencing, netting, and lights
Completed
Hamilton High School, Bandon, Co. Cork
1,394 sq/m artificial grass pitch including fencing and ball wall installation.
Completed
Rennies NS, Cork
600 sq/m artificial grass all-weather surface. Works included full groundworks, kerbing, carpet install (Max 50) and sports fencing.
Completed
De La Salle GAA, Co. Waterford
300 sq/m of artificial grass running track including carpet installation and shock pad.
Completed
St Nicholas NS, Claddagh, Galway
450 sq/m 3G artificial turf playing surface onto tarmac surface, fencing, netting and a 478 sq/m 2G artificial turf onto concrete surface.
Completed
The Hive International Training Centre, Barnet FC, London
PST Sport appointed principal contractor at Barnet Football Club, The Hive International Training Centre to carry out construction of a full size 3G artificial pitch (106m x 71m = 7526 sq/m ) with fencing and floodlights. Also construction of 9 x 5 aside (33m x 22m ) 3G artificial pitches with fencing, ball stop netting and floodlights. The works also incorporated drainage attenuation, pathways both tarmac and artificial finishes, retaining wall, construction of bases for new stand, groundsman sheds and power supply.
Completed
Setanta GAA, Ballymun, Dublin
619 sq/m artificial grass pitch.
Completed
Kilmoyley GAA, Ardfert, Co. Kerry
793 sq/m artificial turf surface with our 60mm Max 60 artificial grass carpet.
Completed
Club Des Sports, East Acton, London
6,000 sq/m 3G pitch including full groundworks and drainage, retaining wall, kerbing, footpatchs, sports fencing and light bases. The chosen surfacing solution: Superb carpet on a pad tested to FIFA Quality Pro on completion.
Completed
Shamrock Rovers FC, Tallaght, Dublin
2 no. indoor artificial grass areas: 110 sq/m 24mm multi-sport surface for gym area and a 480 sq/m training area with 50mm 3G carpet.
Completed
Duagh National School, Listowel, Co. Kerry
336 sq/m artificial grass multi-sport surface with Max 50 carpet. Works included pierce & prep, timber edging and 5m high ball stop netting.
Completed
Killygarry GAA, Annalough, Co. Cavan
1,250 sq/m indoor artificial grass training pitch.
Completed
Carrigaline United AFC, Cork
6,870 sq/m artificial pitch resurface
Completed
Carrigtwohill Community College, Carrigtwohill, Co. Cork
1,632 sq/m artificial grass pitch including installation of rubber edging and 10m high ball stop netting at one end.
Completed
Ursuline College, Blackrock, Cork
1,701 sq/m 3G artificial turf playing surface including strip and removal of existing carpet, preparation of tarmac base, in-situ shock pad, upgrade lighting for LED light and ball wall.
Completed
St Judes GAA, Templeogue, Dublin
604 sq/m 3G playing surface. Project works included the installation of a new drainage system, kerbing, fencing, netting, sports floodlights, shockpad and carpet installation, and a 42 sq/m carpet walkway.
Completed
Scoil Naomh Iosaf, Adare, Co. Limerick
940 sq/m 3G artificial turf playing surface including timber edging, 30m of fencing and netting.
Completed
Massbrook House, Ballina, Co. Mayo
572 sq/m artificial grass surface with in-situ shock pad and 13mm artificial grass carpet.
Completed
Longford Rugby Club
Full size 114m x 72m (8,208 sq/m) artificial grass pitch – full works.
Completed
Firies NS, Co. Kerry
2,280 sq/m 3G artificial turf playing surface including full groundworks, retaining wall, fencing, netting, LED floodlights, ball stop netting and shock pad.
Completed
Lyreacrompane NS, Co. Kerry
355 sq/m artificial grass multi-sport surface with shock pad, 24mm carpet, kerbing and fencing.
Completed
Rath National School, Baltimore, Co. Cork
752 sq/m artificial grass sports surface including pierce and preparation of base, levelling layer, multi-sport carpet and shock pad, plus timber edging.
Completed
Morpeth Town AFC, Craik Park, Morpeth, UK
7,800 sq/m artificial grass pitch including full groundworks, 1.2m high spectator fencing, superb carpet and shock pad.
Completed
St Ives Town FC, Westwood Road, St Ives, Cambs, UK
Complete overhaul to the existing stadium pitch with a new 8000 sq/m artificial pitch. The chosen surfacing solution: 8000m2 50mm Superb artificial carpet on a high density performance shock pad, sat atop a complete drainage system and stone base. Ancillary works included pitch perimeter fencing and upgraded LED floodlights.
Completed
St. Patricks GAA, Robbie Farrell Park, Ballymastone, Donabate, Co. Dublin
450 sq/m 3G artificial turf playing surface including full groundworks, fencing, netting, ball wall and shock pad.
Completed
Cabbage Garden Park, Portobello, Dublin
908 sq/m artificial grass pitch. Works included the removal of the existing 2G synthetic turf, installation of new in-situ shock-pad, Installation of new high performance artificial grass carpet and repairs to existing fencing.
Completed
Ballyjamesduff, Co. Cavan
1,142 sq/m multi-sport pitch.
Completed
Dunmore Community School, Dunmore, Co. Galway
1,856 sq/m 3G artificial turf playing surface including full preparation of tarmac base.
Completed
Loughmore Castleiney GAA, Co. Tipperary
90m x 45m 3G pitch including PST Base site survey, groundworks and drainage, perimeter kerbing, sports fencing, carpet and shock pad installation, netting and light ducting.
Completed
Bunmahon, Co. Waterford
576 sq/m 2G 24mm Muga artificial grass surface.
Completed
Fenor, Co. Waterford
390 sq/m 2G 24mm Muga artificial grass surface.
Completed
London GAA
Artificial turf sideline area adjacent to the main stand for London Gaa at Ruislip GAA Grounds.
Completed
Ringsend Park, Dublin 4
3300 sq/m artificial grass pitch with our Superb synthetic grass. Works included the removal of the existing carpet, testing and inspection of existing shockpad and the installation of new artificial grass carpet.
Completed
Dungarvan GAA, Co Waterford
1,800 sq/m 3G artificial turf pitch including groundworks and drainage, ball wall, fencing, netting and perimeter kerbing.
Completed
Newmarket on Fergus GAA, Co. Clare
3,200 sq/m artificial grass pitch, full works.
Completed
Frankford FC, Kilcormac, Co. Offaly
2,294 sq/m artificial grass pitch including full groundworks, carpet installation, fencing, netting, ducting and light bases.
Completed
Dominican College, Griffith Avenue, Dublin 9
1470 sq/m artificial grass pitch. The project included site clearance works, pierce & prep, lay grit to existing tarmac, installation of precast kerbing, fencing, netting, shockpad and goalposts.
Completed
Scoil Rois, Salthill, Galway
518 sq/m of artificial grass pitch.
Completed
Cistercian College Roscrea, Co. Tipperary
3,100 sq/m 3G surface (2 no. 7-a-side pitches) and a smaller artificial grass multi-sport area. Works included groundworks, carpet installation, fencing, netting, ducting and sports lighting. We also installed some of our 40mm landscaping artificial grass.
Completed
Ardscoil Rís, Griffith Avenue, Dublin
13,912 sq/m natural grass field including full groundworks.
Completed March 2021
St Flannan’s NS, Rathcabbin, Co. Tipperary
800 sq/m (40m x 20m) artificial grass pitch.
Completed March 2021
Turloughmore GAA, Co. Galway
2,109 sq/m artificial pitch – full groundworks, carpet and shock pad installation, ballwall, fencing, netting, kerbing and lighting.
Completed
Meath & District League, Navan, Co. Meath
1,265sq/m pitch resurface.
Completed
Ardfert Community Centre, Co. Kerry
Full-size (6,000 sq/m) artificial grass pitch.
Completed
Cashel Community School, Co. Tipperary
826 sq/m artificial grass multi-sport pitch. Works included pierce and preparation, carpet installation including shock pad and sports fencing.
Completed
Smith O Briens GAA, Co. Clare
Outdoor Area – 327 sq/m of artificial grass pitch with Superb 3G carpet, including full groundworks, carpet installation and fencing.
Indoor Area – 600 sq/m of artificial grass pitch (Superb), including full groundworks, carpet installation, shock pad and netting.
Completed
View 2020 Installation Projects
View 2019 Installation Projects
View 2018 Installation Projects
View 2017 Installation Projects
View 2016 Installation Projects
View 2015 Installation Projects
View 2014 Installation Projects
View 2013 Installation Projects