Works included the installation of a drainage system and sub base construction works followed by perimeter kerbing. Phase 2 of works involved the installation of 60mm artificial grass carpet.
Pictured below: Aerial image of the astro turf pitch at the Holy Family Campus
WATCH: Aerial footage of the new astro turf pitch